top of page

Carlingford Lough Greenway, Albert Basin to Victoria Lock

Location:

Category:

Year:

Client: 

Carlingford, Co. Louth

Newry, Mourne and Down District Council

Civil Engineering

2018

E.Quinn9.jpg

Description

This project was completed by E Quinn Civils Ltd, and represents a strategic link in the overall Carlingford Lough Greenway. Constructed along the historic Middlebank (NIEA protected) between the Newry Ship Canal and the Newry River to Victoria Lough, this 3.5km long project was completed within an 8-week construction period.
The works included:
• New Path Construction
• Dry Stone Revetments
• Installation of Rip Rap for erosion protection
• Repairs to leaks through Middlebank
• Installation of new pedestrian footbridge
• Alterations to existing Canal Lock Gates and Ramps

Project Gallery

bottom of page